How to install and replace the crawler of the crawler shot blasting machine

Sep 29, 2020

  Crawler-type shot blasting machine must be installed step by step before running, and it can only operate normally if installed properly. After the user configures the concrete according to the local soil quality, and checks the horizontal, vertical and horizontal level of the plane with a level, the crawler shot blasting machine can be installed, and the anchor bolts are tightened... The crawler shot blasting machine must be installed step by step before running, only installation Properly can function normally. After the user configures the concrete according to the local soil quality and checks the horizontal and vertical level of the plane with a level meter, the crawler shot blasting machine can be installed and the anchor bolts are tightened. So how to install the crawler shot blasting machine, follow the following four steps:

      1. The crawler-type shot blasting machine has assembled the cleaning room, shot blasting device and other parts into one before leaving the factory, and fasten the elevator and the elevator on the cleaning room with bolts. When installing the bucket elevator, attention should be paid to adjusting the bearing seat of the upper driving pulley to keep it level to avoid belt deviation;

  2, install the manual pill gate and pill supply gate on the separator, connect all the pipelines according to the dust removal system diagram, and the separated waste users can bring their own waste barrels for disposal;

   3. Installation of separator. When the separator is working normally, there should be no gaps in the projectile flow curtain. If the full curtain cannot be formed, the weight should be adjusted until the full curtain is formed. If the separation effect of pellets and sand is not good, the separation plate can be adjusted to obtain a good separation effect. The bulk materials after the pellets have been screened should be removed regularly;

   4. The hoist belt is connected by the user with holes.

   In addition, after the initial installation of the crawler-type shot blasting machine, the crawler will wear out after a period of use and need to be replaced to a certain extent. The track is an important part in the use of the shot blasting machine. It is mainly responsible for the turning and transportation of the workpiece. The damage of the track is related to the normal operation of the equipment, which affects the progress and maintenance cost of the product. The main working principle of the crawler is that a seamless endless rubber belt is worn by three axle rollers, and 2 end plates are pressed to form a turning work chamber, and the product is placed on it, and the product is cleaned by the action of the front and back crawlers. . As a frequently used part, it is very comparative to replace it in time if it is damaged. The following briefly introduces the approximate replacement method:

1.Look at the degree of damage to the crawler first. Generally, the damage of the crawler can be torn and broken. If it is in these two cases, you can use a splint knife to cut the crawler from the inside to the left and right, start the machine, the crawler rotates forward, and the crawler Pull out.

  2. Disassemble the circular plate and faceplate in the chamber, and usually fix the screws in the cover plates of the left and right wall panels of the chamber. Open the cover and you can see.

3. Disassemble the three drive rollers and pull them out from one end. (Some models have rollers, such as models above Q3210). You need to take out the rollers together. Before removing the rollers, you need to remove the lower left and right corners of the equipment. Tighten the screw rod and place it at a higher position.

  4. Put the crawler into the cleaning room. For larger crawler, you can open the eye on the top of the chamber and install it with a wire penetrating the suspension. You can also fix a chain hoist at the position of the shot blaster impeller to pull the crawler.

   5. After the track is placed in a fixed position, insert the pulled out drive roller, and slowly adjust the deviation of the track after the screw rod is tightened. After it is determined, the gate at the upper end of the screw rod is fixed.

   6. After the new track is replaced, the bearings of the active and passive drive rollers must be lubricated to increase their service life.


Related Products

Related News

Product Recommended

  • Efficient Environment...
  • Wind Cycle Sandblasti...
  • Automatic Recycling S...
  • Abrasive Recovery Mec...
  • Cement Plant Filter C...
  • Tyre Steel Wire Cut Shot

share